jitui
jitui
Live RatesHistoryCompareOpportunitiesSpreadsListingsP/LAlertsFlags
jituijitui

BEL coin detail

Funding gap per settlement window of the slower leg: a 1h leg's settlements are summed over the 4h/8h leg's window and then differenced, so both legs cover the identical span (tooltip shows the window, e.g. /4h). Above 0 = the short venue paid more over that window. A good pair stays above 0 most of the time. · 6 exchanges

ExchangeCurrent FR1D3D5D7D14D30D60D90DNext funding
Bybit8h+0.0100%+0.018%+0.078%+0.137%+0.190%+0.394%+0.754%+1.165%-3.509%4h 55m 10s
MEXC8h+0.0100%+0.017%+0.077%+0.120%+0.180%+0.390%+0.742%+1.419%-4.664%4h 55m 10s
Binance8h+0.0100%+0.017%+0.077%+0.119%+0.179%+0.389%+0.742%+1.422%-4.663%4h 55m 10s
Phemex8h+0.0100%0.000%0h0.000%0h0.000%0h0.000%0h0.000%0h+0.270%9d+0.997%39d-1.536%66d…
Gate8h+0.0552%-0.007%+0.153%+0.193%+0.362%+0.869%+1.416%+2.048%-2.214%4h 55m 10s
Aster8h+0.0100%+0.030%+0.090%+0.151%+0.209%+0.417%+0.774%+1.484%-1.927%4h 55m 10s

A dimmed cumulative cell tagged with a day count means that venue listed the coin later, so its sum covers less time than the column. Compare those only against venues with the same coverage.

Price difference

Mid-price gap between the short and long legs (short − long), sampled every 5 minutes (15-min beyond 7 days, 30-min beyond 30 days, hourly beyond 60 days).